Gordon Street improvements

Between Landsdown Drive and Lowes Road

About the project

The City of Guelph completed a Municipal Class Environmental Assessment (EA) study (Schedule ‘B’) for improvements to Gordon Street between Edinburgh Road and Lowes Road.

Through consultation with the community, the study identified and assessed improvements to accommodate future planning and intensification along Gordon Street. Gordon Street improvements will be designed with consideration to all users including vehicular traffic, turning at intersections, transit operations, and facilities for pedestrians and cyclists.  In addition to the works proposed in the EA the design and construction of a new storm sewer will be completed as part of this project.

Detailed design for Gordon Street will begin in 2023/2024, with construction estimated to begin in 2025.
Reconstruction site: Gordon Street from Lowes Road to Landsdown Drive

Resources

Project File Report

Project File ReportProject File Report – Appendix A Project File Report – Appendix BProject File Report – Appendix CProject File Report – Appendix DProject File Report – Appendix EProject File Report – Appendix F

Open House #2 (February 2020)

Open House #2 Presentation (February 2020)Open House #2 Typical cross-sections (February 2020)Open House #2 Preliminary Preferred Solution Map 1 (February 2020)Open House #2 Preliminary Preferred Solution Map 2 (February 2020)Open House #1 (October 2019)

Open House Presentation (October 2019) Notice of Public Information Centre #1: Gordon Street Improvements

Additional resources

Urban Design Concept Plans for the Gordon Street Intensification Corridor

For more information

Jackie Kay, Project Engineer
Engineering and Transportation Services
City of Guelph
519-822-1260 extension 2251