City of Guelph
Menu
Home » Plans and strategies » Clair-Maltby Secondary Plan

Clair-Maltby Secondary Plan



The Natural Heritage System and the Paris Moraine provide the framework for the balanced development of interconnected and sustainable neighbourhoods. This area will be primarily residential in character with a full range and mix of housing types and a variety of other uses that meet the needs of all residents. A system of parks, open spaces and trails will be interwoven throughout to provide opportunities for active and passive recreation.

We protect our environment

Planning for Clair-Maltby puts the environment first. The City will never risk its drinking water supply or natural heritage system for the sake of development. Clair-Maltby will be built around natural heritage features that reflect Guelph’s unique character.

Timeline

  • Phase 1: Background work (May 2016 to April 2017)
  • Phase 2: Preferred Community Structure (May 2017 to June 2018)
  • Phase 3: Master Environmental Servicing Plan and Secondary Plan (July 2018 to 2022); Draft Document Release and Public Open House (June 2021); Statutory Public Meeting (Fall 2021); Final Council Decision (Early 2022)

For more information

Colleen Gammie
Infrastructure Planning Engineer
Engineering and Transportation Services
519-822-1260 extension 2282
[email protected]

Lucas Mollame
Planner II, Policy
Planning and Building Services
519.822.1260 extension 3879
[email protected]