File Number OZS25-018
Official Plan Amendment to the Official Plan to remove a portion of the Subject Lands from the City of Guelph’s Employment Areas and further redesignate the Subject Lands from the ‘Industrial’ and ‘Significant Natural Area and Natural Areas’ designations to the ‘High Density Residential’ designation. Also, to facilitate the development a realignment of the Ecological Linkage portion of the City of Guelph’s Natural Heritage System from the east to the west portion of the Subject Lands by redesignating a portion from the current ‘Industrial’ designation to ‘Significant Natural Area and Natural Areas’ designation is proposed. To facilitate the development, A Zoning By-law Amendment Application for a site-specific High Density Residential 7 zone with a Holding Provision (RH.7xx(Hxx)) is proposed.
- Notice of Complete Application – 266-280 Clair Road West- October 2025
- Notice of Public and Decision Meeting – 266-280 Clair Road West
2nd Submission Materials – April 2026
Updated Material:
- 266-280 Clair Road West & 950 Southgate Drive – Planning Justification Report – April 2026
- 266-280 Clair Road West & Southgate Drive – Affordable Housing Report – April 2026
- 266-280 Clair Road West & 950 Southgate Drive – Site Plan A101 – February 2026
- 266 – 280 Clair Road West & 950 Southgate Drive – Urban Design Brief – March 2026
- 266-280 Clair Road West – Environmental Impact Study – April 2026
- 266 – 280 Clair Road West & 950 Southgate Drive – Wildlife Ontario (ECCC) SARA & MBCA – April 2026
- 266 – 280 Clair Road West & 950 Southgate Drive – Arborist Report and Tree Inventory Preservation Plan – March 2026
- 266 – 280 Clair Road West & 950 Southgate Drive – Transportation Impact Study – January 2026
- 266-280 Clair Road West – Detailed Noise Study – March 2026
- 266-280 Clair Road West & 950 Southgate Drive – Air Quality Impact Study – March 2026
Additional Reports
- 266-280 Clair Road West & 950 Southgate Drive – First Nations Comment Response – March 2026
- 266-280 Clair Road West & 950 Southgate Drive – Air Quality Impact and Detailed Noise Study Peer Review – December 2025
Previous Unchanged Materials
- 266-280 Clair Road West & 950 Southgate Drive – Architectural Package – December 2024
- 266 – 280 Clair Road West – Employment Land Conversion – July 2025
- 260 – 280 Clair Road West – Opinion of Servicing Proposed Development – May 28th, 2025
- 266 – 280 Clair Road West – Functional Servicing and Stormwater Management Report – 2024
- 260 – 280 Clair Road West – Stormwater Detail 1 – December 2024
- 260 – 280 Clair Road West – Stormwater Detail 2 – December 2024
- 260 – 280 Clair Road West – Stormwater Detail 3 – December 2024
- 260 – 280 Clair Road West – Post – Development Drainage Plan – December 2024
- 260 – 280 Clair Road West – Storm Drainage Plan – December 2024
- 260 – 280 Clair Road West – Site Servicing Plan Drawing 1 – December 2024
- 260 – 280 Clair Road West – Site Servicing Plan Drawing 2 – December 2024
- 260 – 280 Clair Road West Erosion and Sediment Control Plan Stage 1 Drawing 1 – December 2024
- 260 – 280 Clair Road West Erosion and Sediment Control Plan Stage 1 Drawing 2 – December 2024
- 260 – 280 Clair Road West Erosion and Sediment Control Plan Stage 2 Drawing 1 – December 2024
- 260 – 280 Clair Road West Erosion and Sediment Control Plan Stage 2 Drawing 2 – December 2024
- 260- 280 Clair Road West – Site Grading Plan Drawing 1- December 2025
- 260 – 280 Clair Road West – Site Grading Plan Drawing 2 – December 2025
- 266 – 280 Clair Road West – Geotechnical Investigation – January 2025
- 266 – 280 Clair Road West – Hydrogeological Investigation – January 2025
- 266 – 280 Clair Road West – Topographic Survey – December 2024
- 266 – 280 Clair Road West – Phase I Environmental Site Assessment Report – December 2024
- 266 – 280 Clair Road West – Stage 1 – 2 Archaeological Assessment – October 2014
- 266 – 280 Clair Road West – Parking Justification Memo – November 2024
1st Formal Submission materials – October 2025
- 266 – 280 Clair Road West Post Development Drainage Plan – December 2024
- 266 – 280 Clair Road West – Urban Design Brief – December 2024
- 266 – 280 Clair road West Traffic Impact Study – December 2024
- 266 – 280 Clair Road West Topographic Survey – December 2024
- 266 – 280 Clair Road West – Stormwater Detail 3 December 2024
- 266- 280 Stormwater Detail 2 – December 2024
- 266- 280 Stormwater Detail 1 – December 2024
- 266-280 Clair Road West – Storm Drainage Plan – December 2024
- 266-280 Clair Road West – Site Servicing Plan Drawing 2 – December 2024
- 266-280 Clair Road West – Site Servicing Plan Drawing 1 – December 2024
- 266-280 Clair Road West – Site Servicing Letter – May 2025
- 266-280 Clair Road West – Site Grading Plan Drawing 2 – December 2024
- 266-280 Clair Road West – Site Grading Plan Drawing 1 – December 2024
- 266 – 280 Clair road West – Planning Justification Report – July 2025
- 266-280 Clair Road West Phrase I Environmental Site Assessment Report – December 2024
- 266-280 Clair Road West – Pedestrian Wind Conditions – Letter of Opinion – December 2024
- 266-280 Clair Road West – Parking Justification Memo
- 266-280 Clair Road West – Noise Study – December 2024
- 266-280 Clair Road West – Hydrogeological Investigation – January 2025
- 266-280 Clair Road West – Geotechnical Investigation – January 2025
- 266-280 Clair Road West – Functional Servicing and Stormwater Management Report – December 2024
- 266-280 Clair Road West – Fee Deferral Repayment Program – July 2025
- 266-280 Clair Road West – Erosion and Sediment Control Plan Stage 2 Drawing 2 – December 2024
- 266 – 280 Clair Road West – Erosion and Sediment Control Plan Stage 2 Drawing 1 – December 2024
- 266 – 280 Clair Road West – Erosion and Sediment Control Plan Stage 1 Drawing 2 – December 2024
- 266-280 Clair Road West – erosion and Sediment Control Plan Stage 1 Drawing 1 – December 2024
- 266 – 280 Clair Road West – Environment Impact Study – December 2024
- 266-280 Clair Road West – Employment Land Conversion – July 2025
- 266 – 280 Clair Road West – Cover Letter – July 2025
- 266-280 Clair Road West – Community Energy Initiative Commitment Letter – December 2024
- 266-280 Clair Road West – Architectural Package Site Statistics – December 2024
- 266 – 280 Clair Road West – Architectural Package (Site Plan Only) – December 2024
- 266 – 280 Clair Road West – Architectural Package – December 2024
- 266-280 Clair Road West – Arborist Report & Tree Inventory and Preservation Plan – November 2024
- 266-280 Clair Road West – Application Official Plan and Zoning By-law Amendment – July 2025
- 266-280 Clair Road West – Air Quality Study – December 2024
- 280 Clair Road West – Stage 1 – 2 Archaeological Assessment – October 2014
Pre- submission – Associated reports and materials
This new process provides the opportunity for applicants to work with city staff to resolve issues prior to deeming applications complete. Official Plan amendment and Zoning By-law amendment are proposed to permit the conversion of employment lands to high-density residential to permit 960 residential units in a mix of Townhouse and High-rise (14-16 storey) built forms.
- Cover Letter – December 2024
- Air Quality Study – December 2024
- Architectural Package – December 2024
- Architectural Package – December 2024_SITE PLAN ONLY
- Architectural Package Site Statistics – December 2024
- Community Energy Initiative Commitment Letter – December 2024
- Employment Land Conversion – December 2024
- Environmental Impact Study – December 2024
- Erosion and Sediment Control Plan Stage 1 Drawing 1 – December 2024
- Erosion and Sediment Control Plan Stage 1 Drawing 2 – December 2024
- Erosion and Sediment Control Plan Stage 2 Drawing 1 – December 2024
- Erosion and Sediment Control Plan Stage 2 Drawing 2 – December 2024
- Functional Servicing and Stormwater Management Report – December 2024
- Noise Study – December 2024
- Notes Plan – December 2024
- Official Plan and Zoning By-law Amendment Application Form – December 2024
- Parking Justification Memo
- Phase I Environmental Site Assessment Report – December 2024
- Planning Justification Report – December 2024
- Site Grading Plan Drawing 1 – December 2024
- Site Grading Plan Drawing 2 – December 2024
- Site Servicing Plan Drawing 1 – December 2024
- Site Servicing Plan Drawing 2 – December 2024
- Storm Drainage Plan – December 2024
- Stormwater Detail 1 – December 2024
- Stormwater Detail 2 – December 2024
- Stormwater Detail 3 – December 2024
- Topographic Survey – December 2024
- Traffic Impact Study – December 2024
- Pedestrian Wind Conditions – Letter of Opinion – December 2024
- Post-Development Drainage Plan – December 2024
- Geotechnical Investigation – January 2025
- Hydrogeological Investigation – January 2025
For information
Anand Shah, Senior Development Planner
[email protected]