Notice Date: November 5, 2026
What’s happening:
The City is working with TM3 Inc. to install new crossrides and traffic control signal infrastructure at the intersection of Woodlawn Road West at Nicklin Road.
Why:
This project supports continuous protected multi-use path and protected bike crossing at the intersection of Woodlawn Road West and Nicklin Road. For more information about the improvements, please contact [email protected].
When:
Work is expected to begin on or about November 9, 2026, and is expected to be completed by January 4, 2027, weather permitting.
Changes during construction
Traffic lanes: Two-way traffic will be maintained at all times. Please follow posted signs for safety. A full road closure is not planned; however, occasional short term lane closures may occur, and delays should be expected.
Sidewalks: Pedestrian access will be maintained throughout construction. In the event that a section of sidewalk must be temporarily closed, a safe alternative route will be clearly identified and kept accessible at all times.
Guelph Transit: No changes.
Waste collection: No changes.
Private driveway access: Construction activities and equipment movement may temporarily impact access to private property.
Map of construction area

For more information
For more information about the project, or if you require this document to be provided in an alternative format as per the Accessibility for Ontarians with Disabilities Act (2005), please contact [email protected] or visit guelph.ca/construction







