City of Guelph
Home » Uncategorized » Construction notice: Full closure on Cassino Avenue due to water service installation

Construction notice: Full closure on Cassino Avenue due to water service installation

Notice date: November 6, 2026

What’s happening:

​​In4Structure is ​removing road asphalt, curb, and boulevard to install a new sanitary sewer. All surfaces will be restored back to their original condition​.

Why:

This project supports the construction of a new development at 108 Cassino Avenue. For more information about the development, please contact ​[email protected]

When:

​​Work is expected to start on or about November 11, and should be completed by November 27, weather permitting.

Changes during construction

Traffic lanes: Cassino Avenue will be closed to through traffic from Victoria Road North to Hadati Road.​ Local traffic will be permitted along Cassino Avenue during construction​; however, there will be no through access at the Cassino Avenue and Palermo Crescent intersection. ​
Sidewalks: The north sidewalk along Cassino Avenue will be closed, from Victoria Road North to Hadati Road. Please use the sidewalk on the south side of Cassino Avenue.
Guelph Transit: ​Guelph Transit route 13 will be temporarily detoured during construction. Visit guelphtransit.ca for details. 
Waste collection: ​No changes.
Private driveway access: ​Every effort will be made to maintain access to driveways in the construction area during working hours (7 a.m.– 6 p.m.). Construction activities and equipment movement may temporarily impact access to private property.  

Map of construction area

For more information

For more information about the project, or if you require this document to be provided in an alternative format as per the Accessibility for Ontarians with Disabilities Act (2005), please contact [email protected] or visit guelph.ca/construction