Traffic notice: Zaduk Place traffic calming measures

Between Sweeney Drive and McAlister Boulevard

As part of the development of the Kortright Hills subdivision, traffic calming measures will be installed on Zaduk Place to deter through vehicles and reduce vehicle speeds in the neighbourhood. These measures include one (1) set of speed cushions and two (2) traffic islands to narrow the pavement width. On-street parking will be restricted in the area of the traffic islands.

Lane reductions and pedestrian access

Two-way traffic and pedestrian sidewalk access will be maintained during the installation process. Every effort will be made to maintain access to driveways within the work area Monday to Friday during working hours (7 a.m.-7 p.m.). Temporary delays are expected.

Installation starting April 29

The installation of temporary traffic calming measures will start the week of April 29. Crews will then install permanent measures later in the summer.

City services

There will be no interruption to any City services during construction. Waste collection will not be affected. Please continue to place your green, blue and grey carts at the curb, as per your regular schedule.

Map of construction area

The City appreciates your patience, understanding and co-operation during this traffic calming installation project. Updates will be posted at guelph.ca/construction.

For more information

Julie Tot, C. Tech
Traffic Technologist II, Engineering and Transportation Services
519-822-1260 extension 2048
julie.tot@guelph.ca