Norwich Street Bridge improvements

About the project

Map of area of construction on the Norwich Street Bridge on Norwich Street East

Area of construction on the Norwich Street Bridge

The City of Guelph has initiated a Class Environmental Assessment (EA) study for proposed improvements to the deteriorating Norwich Street Bridge. It’s currently closed to vehicle traffic and  serves as a pedestrian crossing.

The study will address the community’s needs through a number of possible solutions, including:

  1. Rehabilitation
  2. Replacement
  3. Removal
  4. A “do nothing” alternative that would result in the permanent closure of the bridge

The location and approximate extent of the study area are shown on the map.

 

Open house materials

8 MBOpen house display boards – September 21, 2016 4 MBOpen house display boards – May 17, 2017

For more information

Please contact one of our project team members if you have questions or comments, or would like to be added to the project mailing list.

Andrew Janes, P. Eng.,
Project Engineer Supervisor
City of Guelph
519-822-1260 extension 2338
andrew.janes@guelph.ca
Brent Willis, P.Eng.
Project Manager
GM BluePlan Engineering Limited
519-376-1805
brent.willis@gmblueplan.ca